Gas Installation Technology 3rd Edition
The revised third edition updates the economic considerations in light of more stringent regulations and standards, and also provides the latest developments in electrochemical protection technology. Strategies for measuring potential and data evaluation by computer also have been added. 1997 by Gulf Publishing, 7” x 10”, hardbound, 520. Tech Books Yard Books & Notes. 800 Electronics Engineering 429 Encyclopedia of Electrical and Electronics Engineering 53 Encyclopedia of Science and Technology 19 Engineering Principles 32 Environmental Engineering 9 Fire Safety 35 GATE Civil Engineering Notes 78 Marine Engineering 65. Engineering Thermodynamics 3rd edition b.
The Gas Safety (Installation and Use) (Amendment) Regulations 2018 came into force on 6 April 2018.
This Approved Code of Practice and guidance gives advice on how to meet the requirements of GSIUR and the amending regulations.
This guidance is for anyone who may have a duty under the Gas Safety (Installation and Use) Regulations 1998, including those who install, service, maintain or repair gas appliances and other gas fittings. Landlords also have duties under these regulations.
- Date of publication:
- 2018
- ISBN:
- 9780717666744
- Series code:
- L56 (Fifth edition)
- Download a free copy - L56
Changes to the legislation
The changes to GSIUR, which do not relax regulatory requirements or reduce safety standards, are to:
- introduce a degree of flexibility to the timing of landlords’ annual gas safety checks. This change means that landlords can carry out the annual gas safety check in the two months before the due date and retain the existing expiry date. This avoids landlords waiting until the last minute and not gaining access, or having to shorten the annual cycle check to comply with the law. There is no change to the legal requirement for an annual gas safety check or for maintenance to be carried out
- incorporate an existing exemption into law to carry out alternative checks in situations where there is no meter to directly measure the heat input and it is not possible to measure the operating pressure, and extend the scope slightly to include situations where the meter is not accessible or the meter display is not working
- disapply most of the requirements of GSIUR for installations fed by a dedicated gas supply, which are primarily used to supply compressed natural gas (CNG) to vehicles and which incorporate at least one gas compressor with an electric motor input power rating exceeding 5 kilowatts, bringing them in line with other industrial premises. Other more appropriate regulations already apply to these premises
Related resources
See also
2014
Provides a Code of Practice for the installation of natural gas or liquefied petroleum gas, in domestic premises, from the point of delivery to the gas appliance. Includes: the installation of meters, appliances and associated pipework, installation of LPG cylinders and intermediate pressure LPG systems from the point of delivery, design, construction and testing, pipework ancillaries and meters, and the installation and commissioning of appliances and safe operation and maintenance in use.
Supersedes - IS 813:2002.
Quickbooks for mac vs windows 2016. 70% Overall ScoreWhen it comes to accounting software, QuickBooks is still one of the most well known packages out there.
National Standards Authority of Ireland
National Standards Authority of Ireland (NSAI) is Ireland’s official standards body. They operate under the National Standards Authority of Ireland Act (1996) and are accountable to the Minister of Enterprise, Trade, Employment and Innovation.
1 Swift Square
Northwood
Santry
Dublin 9
Ireland
Website: www.nsai.ie
Email: nsai@nsai.ie
Tel: 01 807 3800
- The Construction Information Service has over 28,000 construction related standards, regulations, technical advice & articles from 500+ publishers.
- Free to use BIM project management tool provides step-by-step help to define, manage and validate responsibility for information development and delivery at each stage of the asset life cycle in level 2 BIM projects.